Монтаж, водоснабжение и контроль
Install the unit in a submerged fountain arrangement with clean water and a steady supply. Coordinate the operating water level, mounting orientation, and DN50 inlet connection with the project pipework and intended water effect.
Check the moving assembly and spray at both ends of the planned sweep. Keep nearby pipework, lighting, and pool structures clear of the movement, and allow space for the fully expanded water pattern and its receiving area.
Route cables to accommodate movement and leave access to the drive, nozzle mechanism, and lighting for maintenance. Confirm the power supplies, DMX512 interface, channel assignment, and programming with the project’s fountain control system.