Введение в эксплуатацию системы освещения музыкального танцующего фонтана в Ташкенте, Узбекистан.

On-Site Engineering Update

The lighting commissioning phase of the musical dancing fountain project in Tashkent, Uzbekistan, has now been completed on-site.
Unlike factory testing, on-site commissioning allows engineers to verify how the lighting system performs under real installation conditions, including cable routing, signal transmission distance, and environmental interference. Completing this step is essential before any integrated water and music testing can begin.

By completing lighting commissioning first, the control system can later synchronize water effects and music based on a stable visual reference, reducing adjustment time during final show tuning.

Why Musical Dancing Fountain Lighting Commissioning Comes First

In a large-scale fountain system, lighting is not treated as a decorative add-on. It is a core part of the show logic.

During this stage, our engineers verified:

Signal stability across the DMX lighting network
Response accuracy of underwater lights to control commands
Brightness consistency after installation depth and angle adjustment
System behavior under continuous operation

By completing lighting commissioning first, the control system can later synchronize water effects and music based on a stable visual reference, reducing adjustment time during final show tuning.

Project-Specific Installation Considerations

This fountain project in Tashkent, Uzbekistan, required customized on-site calibration due to the site layout and installation environment.
Light positions, beam angles, and output levels were adjusted directly on site to ensure visibility, balance, and alignment with the planned fountain choreography. These adjustments cannot be finalized during factory testing and must be completed after installation.

Next Phase: Integrated Musical Dancing Fountain Show Testing

With lighting commissioning completed, the project will move into integrated testing, including:

Water effect commissioning
Music synchronization and timing verification
Fine-tuning of control parameters for the show operation

This step-by-step commissioning process helps ensure stable performance and reliable long-term operation of the dancing fountain show system.

Large-Scale Musical Dancing Fountain Expertise

Our team specializes in the design and construction of large-scale fountain projects, offering comprehensive solutions from system design to on-site commissioning.
For an overview of our system capabilities, please visit our
👉 musical dancing fountain solution page.

Project Consultation

If you are planning a musical fountain or dancing fountain project, we welcome you to contact us with your site details and project requirements. Our engineering team will provide a technical proposal based on your specific conditions.

Свяжитесь с нами

Заполните форму, чтобы напрямую пообщаться с нашими инженерами!

АДРЕС

Китай, пров. Сычуань, г. Нэйцзян, Зона экономического развития, ул. Аньтай, 399

ТЕЛЕФОН/WHATSAPP

0086 18816238859

ЭЛ. ПОЧТА

sales@huaxinfountains.com

ПОДПИСЫВАЙТЕСЬ

Пожалуйста, введите ваше полное имя.
This field is required.
Пожалуйста, введите корректный номер телефона.
This field is required.
Пожалуйста, подробно опишите требования к вашему фонтанному проекту.
This field is required.

Прокрутить вверх