NEWS

Fountain Installation Project in Uzbekistan Progresses On Site

A large fountain installation project in Uzbekistan is progressing on site, with construction and equipment installation ongoing. Our engineering team has recently shared updated photos from the project location, showing the ongoing installation of fountain devices and supporting systems.

fountain installation project in Margilan Uzbekistan construction site
The project is located at BURHONIDDIN AL-MARGILONIY ILMIY TARAQQIYOT MARKAZI, where a large-scale fountain system is being developed as part of the surrounding public space and landscape environment.

Based on the current construction layout, the fountain area measures approximately 130 meters in length and 20 meters in width, forming a long linear water feature designed for visual performance and public viewing.

Project Layout and Fountain Design

The fountain installation project in Uzbekistan involves the installation of a wide range of fountain devices and multimedia elements designed to create dynamic water performances.

Key equipment currently being installed includes:
2D Swing Jet (Dual-Nozzle Mount) – 74 sets
Tai Chi Fountain Device – 6 sets
Variable Fountain Device – 27 sets
Ultra High Jet Nozzle – 1 unit
Air Explosion Fountain Device – 98 sets
Flame Fountain Device – 12 sets

These fountain devices are distributed throughout the fountain layout to create different water effects, motion patterns, and performance layers

installing fountain devices at Margilan Uzbekistan project location

The lighting system will be integrated with the fountain control system to produce synchronized water, light, and multimedia effects once the project enters the commissioning stage.

Integration of Multimedia Fountain Systems

In addition to the mechanical fountain devices, the project also includes several multimedia systems that will enhance the visual performance of the fountain installation.

The multimedia configuration includes:
Water screen projection system – 1 set
Laser lighting system – 3 sets
Moving head lights – 20 units
DMX512 underwater lights – 860 units

Current Construction and Installation Progress

Installation work on site is currently focused on the placement and fixing of fountain devices, pipeline preparation, and electrical infrastructure required for the fountain system.

Engineering teams are coordinating multiple installation steps, including equipment positioning, structural installation, and system preparation for the next phase of construction.

The fountain installation project in Uzbekistan will continue progressing through several stages before entering the system testing and commissioning phase.

fountain infrastructure installation at Margilan Uzbekistan fountain project
fountain system installation work in Uzbekistan construction project

Preparing for the Next Project Phase

Once the main equipment installation is completed, the next stages of the project will include system integration, fountain programming, and performance testing.

These steps ensure that each fountain device operates correctly within the overall system and that the visual performance of the fountain meets the design objectives.

With installation work steadily progressing, the project is moving toward the next phase of development, where the fountain system will gradually transition from construction to operational testing.

Contact Us

Fill out this form to chat directly with our engineers!

Address

No. 399, Antai Street, Economic Development Zone, Neijiang City, Sichuan Province, China.

Phone/whatsapp

0086 18816238859

Email

sales@huaxinfountains.com

Follow Us:

Please enter your full name.
This field is required.
Please enter a valid phone number.
This field is required.
Please describe your fountain project requirements in detail.
This field is required.
Scroll to Top