| Project Name | Al-Saraya Al-Hamra Lake Digital Fountain Project |
| Location | Saraya Lake, Tripoli, Libya |
| Landmark | Al-Saraya Al-Hamra / Red Castle |
| Completion | 2025 |
| Fountain Type | Digital musical / dancing fountain |
| Installation Environment | Lake/seawater fountain |
| Fountain Scale | Approx. 100 m × 10 m |
| Maximum Jet Height | Approx. 60 m |
| Main Water Effects | High jets, 1D swing jets, 2D swing jets, variable jets, rotating jets, air explosion effects, and straight jets |
| Multimedia | DMX512 underwater lighting, laser system, and professional audio |
| Control | Programmed music-synchronized fountain control system |
| System Power | Approx. 1,060.95 kW |
| Control Room Distance | Approx. 150 m from fountain centre |
| Huaxin Fountain Scope | Fountain engineering, equipment manufacturing and supply, control system, show programming and technical support |