| Stage | Main question to answer | Typical outcome |
|---|---|---|
| Project brief | What should the fountain achieve? | Project goals and preliminary scope |
| Site assessment | What can the site support? | Site information and design constraints |
| Concept design | What should the audience see and experience? | Initial layout and water-effect direction |
| System planning | What equipment and infrastructure are needed? | Preliminary hydraulic, electrical, and control requirements |
| Quotation | What is included in each proposal? | Defined equipment and service scope |
| Production and installation | Who supplies and installs each part? | Coordinated delivery and site work |
| Commissioning and programming | Does the complete system perform as intended? | Tested fountain and programmed show |
| Handover and operation | Who will operate and maintain the system? | Operating information and support, as agreed |

| Site information | Why it matters |
|---|---|
| Pool or water-area dimensions | Establishes the available space for the fountain layout |
| Site plan and elevations | Helps identify levels, surrounding structures, and access |
| Main viewing areas | Influences the orientation and visual composition |
| Water depth or water-level range | Affects equipment layout and installation planning |
| Wind and climate conditions | Helps assess spray control and operating requirements |
| Water source and available water-quality information | Supports equipment and water-system planning |
| Electrical supply | Helps the team review power requirements and interfaces |
| Equipment room and cable routes | Affects control equipment placement and installation |
| Site access | Influences delivery, installation and maintenance arrangements |
| Comparison item | What to check |
|---|---|
| Fountain effects | Types of effects, number of zones and intended spray heights |
| Equipment | Pumps, pipework, lighting and control equipment included in the proposal |
| Materials | Specified materials for equipment and pipework where applicable |
| Control and programming | Control equipment, show programming and integration scope |
| Installation | Who provides local labour, technical guidance and site supervision |
| Commissioning | Whether system testing, adjustment and show commissioning are included |
| Shipping | Delivery destination and agreed shipping terms |
| Exclusions | Civil works, utilities, water treatment, or other items handled separately |

| Work item | Responsibility to confirm |
|---|---|
| Pool and foundations | Who designs and constructs the civil works? |
| Fountain layout and equipment | Who prepares the design and supplies the system? |
| Power supply and main connections | Who provides and connects the site supply? |
| Equipment installation | Who carries out physical installation? |
| Technical guidance | Who provides instructions and site supervision? |
| Programming and commissioning | Who tests the system and prepares the show? |
| Training and handover | What operating information and support will be provided, and by whom? |
| Common mistake | Better approach |
|---|---|
| Choosing effects before defining the audience and site | Start with the project purpose, viewing positions and site conditions |
| Comparing quotations by price alone | Compare equipment, specifications, responsibilities and exclusions |
| Treating the fountain separately from the pool and utilities | Coordinate civil, hydraulic, electrical and control interfaces early |
| Leaving programming until the opening date is near | Include testing, programming and approval in the project schedule |
| Assuming every supplier includes the same installation service | Confirm local labour, guidance, travel and commissioning responsibilities |
| Focusing only on the opening show | Plan for access, operation, documentation and maintenance |
| Copying another project without reviewing the new site | Adapt the design to the new pool, audience, climate, and budget |